1999–2026: WHO GOT WHAT? THE FEDERAL INFRASTRUCTURE INVESTMENT DIVIDE IN NIGERIA
A year-by-year examination of federal investment in the South-East, South-South, South-West and Northern Nigeria.
Twenty-seven years of democracy. Six geopolitical zones. One federation. But have all regions received a fair share of national infrastructure investment?
This investigation will examine whether the South-East and South-South have been disadvantaged in the distribution of federal infrastructure spending compared with other parts of Nigeria.
The comparison must go beyond political speeches and budget announcements. We need to distinguish:
- What government budgeted.
- What government actually released.
- What was spent.
- What projects were completed.
- What infrastructure is operational today.
- What economic benefits each region received.
An allocation is not expenditure, and expenditure is not necessarily a completed project.
PART ONE: WHAT THE RECORDS ACTUALLY SHOW
A. The 1999–2026 regional comparison
An important finding has emerged from the records: Nigeria publishes annual federal budgets and budget implementation reports, but these do not provide one consistent, consolidated annual table showing actual federal infrastructure expenditure across all six geopolitical zones from 1999 to 2026.
The Budget Office's published archive provides annual implementation reports from 2009 onwards, but a regional comparison requires extracting individual projects and identifying their actual locations. Budget Office of the Federation
I will not manufacture regional figures to make an argument appear stronger.
Here is the period-by-period evidence position:
| Period | What can be established |
|---|---|
| 1999–2003 | Obasanjo-era infrastructure baseline; regional actual expenditure needs reconstruction. |
| 2004–2007 | Major federal road and rail commitments; project-by-project verification required. |
| 2008–2010 | Yar'Adua/Jonathan transition; eastern and western transport commitments require comparison. |
| 2011–2015 | Jonathan-era federal projects and railway development; actual spending must be separated from announcements. |
| 2016–2019 | Buhari-era railway, road and airport expansion; geographic distribution requires project-level accounting. |
| 2020–2022 | COVID-era and post-COVID capital execution; allocations and releases need separate treatment. |
| 2023–2025 | Tinubu-era approvals and spending; some regional figures have been publicly disclosed. |
| 2026 | Current-year budget and partial releases; final expenditure is not yet available. |
B. The 2023 ICPC investigation: a particularly important discovery
Official ICPC report
The Independent Corrupt Practices and Other Related Offences Commission (ICPC) published an analysis of the 2023 federal budget.
Its report identified 443 capital projects, valued at ₦58.1 billion, distributed geographically as follows:
| Geopolitical zone | Projects | Value |
|---|---|---|
| South-East | 104 | ₦11.89bn |
| South-South | 41 | ₦6.10bn |
| South-West | 95 | ₦10.89bn |
| North-West | 56 | ₦8.76bn |
| North-East | 92 | ₦14.68bn |
| North-Central | 55 | ₦5.79bn |
icpc.gov.ng
This finding is interesting for two reasons.
First, the South-East had the highest number of projects in this particular sample.
Second, the South-South had the lowest number of projects.
However, the South-East's larger project count does not automatically establish greater overall investment. The figures cover the report's selected project dataset, not the entire federal capital budget. They must not be presented as total regional spending.
The ICPC also identified substantial problems with the 2023 budget, including ₦638.74 billion in projects it classified as inserted or padded, ₦527.39 billion in out-of-mandate projects and ₦353.29 billion in suspicious projects. icpc.gov.ng
This raises a second investigative question: how much of the money voted for projects actually translated into infrastructure Nigerians can use?
PART TWO: THE TINUBU ADMINISTRATION'S REGIONAL FIGURES — 2023–2025
In September 2025, the Federal Government publicly defended its record against accusations of regional imbalance.
The Minister of Information, Mohammed Idris, disclosed the following figures, attributed to federal project approvals since Tinubu assumed office in May 2023:
| Region | Government-reported project approvals |
|---|---|
| North-West | ₦5.97 trillion |
| South-South | ₦2.41 trillion |
| North-Central | ₦1.13 trillion |
| South-East | ₦407 billion |
| North-East | ₦400 billion |
| South-West, excluding Lagos | ₦604 billion |
| Lagos, separately reported | ₦1.20 trillion |
fmino.gov.ng +2
What do these figures tell us?
The combined reported approvals for the South-East and South-South are:
₦407bn + ₦2,410bn = ₦2,817bn
The North-West alone received reported approvals of ₦5.97 trillion.
That is approximately 2.12 times the combined South-East and South-South figure.
Comparison of reported approvals
South-East + South-South
₦2.817tn
North-West
₦5.970tn
North-West's reported approvals were about 112% higher than the combined eastern figure.
This is a major finding, but it must be interpreted carefully.
The government argues that the projects are national economic arteries rather than regional gifts. Some roads cross several states and benefit more than one geopolitical zone.
That argument is valid where the projects genuinely provide national connectivity.
But it raises another question: What methodology did the government use to assign the full value of a multi-state project to a particular region?
The Federal Government should publish the underlying project register, contract values, geographical segments, funding sources and actual releases.
Without that information, the announced figures cannot independently establish equitable distribution.
The other side: actual road funding
A June 2026 investigation by The PUNCH, using Open Treasury Portal records, found the following national road-sector figures:
| Year | Road-related budget | Reported releases |
|---|---|---|
| 2023 | ₦2.53tn | ₦631.51bn |
| 2024 | ₦9.39tn | ₦784.60bn |
| 2025 | ₦7.22tn | ₦670.68bn |
| 2026 to April | ₦35.79tn | ₦597.08bn |
Punch Newspapers
The striking issue is that the national road budget rose dramatically, but actual releases remained comparatively small.
The reported release rates were approximately:
- 2023: 24.95%.
- 2024: 8.36%.
- 2025: 9.29%.
- 2026 through April: 1.67%.
This exposes a fundamental weakness in using budget announcements to judge regional development.
A region can appear to have received trillions in project approvals without the money actually reaching contractors or the projects being completed.
It is therefore essential to obtain the state-by-state releases behind these national totals.
PART THREE: THE HISTORICAL QUESTION — 1999 TO 2022
To establish whether regional inequality is longstanding, we must examine the administrations separately.
1999–2007: Olusegun Obasanjo administration
Chief Olusegun Obasanjo
The period saw major national infrastructure initiatives, including railway modernisation planning and the development of major federal road corridors.
The railway development programme was initiated in 2006, with plans to modernise the western and eastern railway corridors.
The historical record shows the Port Harcourt–Enugu railway was already part of Nigeria's older eastern railway network. ejrcf.or.jp
The investigation must establish how much was spent on each corridor and how much infrastructure was actually delivered.
2007–2010: Umaru Musa Yar'Adua administration
Umaru Musa Yar'Adua
This period requires examination of inherited infrastructure projects, railway commitments and the development of eastern and western transport corridors.
2010–2015: Goodluck Jonathan administration
Goodluck Jonathan
The railway modernisation programme continued, alongside major national transport and road investments.
The National Planning Commission's historical planning document recorded the Lagos–Kano western railway as operational, while the Port Harcourt–Maiduguri eastern line was reported at approximately 36% completion in the period covered by that document. tr
This is an important historical comparison, although the completion figures must be tied to their exact reporting date before publication.
2015–2023: Muhammadu Buhari administration
Muhammadu Buhari
Major railway, highway and airport investments were undertaken or continued.
The Lagos–Ibadan standard-gauge railway entered commercial operation in 2021. The Federal Government also promoted the Port Harcourt–Maiduguri eastern railway and other major railway corridors. The State House, Abuja +1
A proper investigation must compare the actual money spent on the western and eastern railway lines, their completion levels, passenger traffic and freight capacity.
It would be wrong to assume that the amount allocated to a railway is the amount ultimately spent on it.
PART FOUR: THE QUESTIONS THE GOVERNMENT MUST ANSWER
I consider these the most important outstanding questions.
| No. | Question | Responsible institution |
|---|---|---|
| 1 | How much federal infrastructure expenditure went to each state annually since 1999? | Budget Office |
| 2 | How much was actually released and paid? | Accountant-General |
| 3 | What was completed and what was abandoned? | Ministry of Works |
| 4 | What was invested in eastern and western railways? | Nigerian Railway Corporation |
| 5 | What were the actual investments in eastern and western ports? | Nigerian Ports Authority |
| 6 | How much was spent on international airports by state? | Federal Ministry of Aviation |
| 7 | How much was spent on electricity infrastructure in each zone? | Ministry of Power |
| 8 | What was the value of federal projects actually delivered in each zone? | ICPC and Budget Office |
There is another important distinction: federal projects must be separated from state-funded projects. Otherwise, a state government's road expenditure could mistakenly be credited to the Federal Government.
The Nigeria Governors' Forum has a public finance database that can help establish state-government expenditure separately. publicfinance.ngf.org.ng +1
PART FIVE: MY INVESTIGATIVE CONCLUSION
Evidence still incomplete
The evidence presently establishes three important points:
- The Federal Government's own 2025 regional project-approval figures show a substantial difference between the South-East and South-South combined and the North-West.
- The ICPC's 2023 examination exposes irregularities in the federal capital budget and significant differences in selected constituency and senatorial project allocations.
- National road-budget releases have been substantially lower than the approved provisions, making it impossible to equate announced investment with delivered infrastructure.
However, these findings do not yet establish the total historical federal infrastructure spending per geopolitical zone between 1999 and 2026.
That requires a state-by-state reconstruction of project expenditure, including multi-state projects and actual payments.
We should not publish a fabricated 27-year regional spending table. The investigation must be strong enough to withstand a government rebuttal, an independent auditor's examination and a newspaper fact-check.
THE NEXT INVESTIGATIVE STEP
I recommend that we build the definitive comparison using these six geopolitical zones:
The six-zone infrastructure audit
The five expenditure categories
- Roads and bridges.
- Railways and seaports.
- Airports and aviation.
- Electricity and power infrastructure.
- Federal hospitals, universities and other major institutions.
For each year, we should record the original budget, revised budget, actual releases, actual expenditure, project location and completion status.
My proposed headline for the final publication:
27 YEARS OF FEDERAL SPENDING: HAS NIGERIA BUILT SIX EQUAL REGIONS OR SIX DIFFERENT LEVELS OF OPPORTUNITY?
This is the investigation that can move the national debate beyond allegations of marginalisation and into verifiable public-accountability evidence.